Operating Costs of Gold Processing Plant 911 Metallurgist
The cost data above referred to has been compiled from actual operating results and shows the cost of milling both for the old 50ton plant and the new 100 ton concentrator, as is now in use. Note the reduction in milling costs through the use of the new flowsheet which includes an 8cell "SubA" Flotation Machine.