Ensure that the gland seal water shut—off valves are open, and that gland seal water is flowing to the appropriate cyclone feed pump. Check that the lime slurry pump is in operation, circulating lime slurry around the mill loop. Also ensure that the shutoff valve in the lime line to the ball mill feed chute is open.